1. Inspection During Construction

    Building Inspection Reports

    Inspection During Construction

    The common procedure in the building industry is for the owners to engage a building contractor to build for them for a price; licenced contractor is responsible at the end of the day to supply a building that complies with the relevant standards and quality, in most cases this does not happen!  

    Read more                           Book an inspection

  2. Defects Reports

    Building Defects Report

    Defects Reports

    A condition report of buildings adjacent to a construction site prior to the commencement of construction, often a Council condition of approval. Usually done as a photographic record of the structure. Councils, require suitably qualified people, and may not accept a building consultant.  

    Read more                           Book an inspection

  3. Expert Witness Reports

    Expert Witness Report

    Expert Witness Reports

    Defects or incomplete expert report completed in a method evidence and preparing reports that may at some stage be used as evidence for litigation purposes in any jurisdiction.  

    Read more                           Book an inspection

  4. Dilapidation Reports

    Dilapidation Report

    Dilapidation Reports

    The common procedure in the building industry is for the owners to engage a building contractor to build for them for a price; licenced contractor is responsible at the end of the day to supply a building that complies with the relevant standards and quality, in most cases this does not happen!  

    Read more                           Book an inspection


Access Dimensions

General reference for Access-ways and Doors Relevant to Australian Standards for Access and Mobility

  • Doorway = 850mmAccess
  • Door controls that need to be grasped or turned e.g. handles, locks = 900 to 1100mm.
  • Door controls that need to be pushed. = 900 to 1200mm
  • Door controls that need to be touched. = 900 to 1250mm
  • Internal walkway width. = 1000mm
  • Overhead clearance. = 2000 to 1980mm at doorway
  • Path of principal public entry. = 1000mm